HT-DG
Double Girder EOT Crane
Two bridge girders with a top-running crab. Built for heavy capacity, long span and continuous duty.
Capacity 5 – 100 T
Span 8 – 35 M
Duty class M5 – M8

How it is built
Where capacity, span or duty cycle rules out a single girder, the double girder configuration carries the crab trolley on rails on top of two box girders. This gives you maximum hook height for a given building clearance, and lets the crane carry walkways, cabins, magnet or grab attachments. Designed to IS 807 and IS 3177 for continuous industrial duty.
Configuration
- Twin box girders with full-length maintenance walkway
- Main and auxiliary hoist on a common crab
- VFD control on all three motions
- Operator cabin or radio remote operation
- Anti-collision, overload protection and rail clamps
- Grab, magnet and ladle attachments to order
Technical data
- Capacity
- 5 – 100T
- Span
- 8 – 35M
- Lift height
- up to 30M
- Duty class (IS 3177)
- M5 – M8
- Main hoist speed
- 1.5 – 5m/min
- Aux hoist speed
- 4 – 10m/min
- Cross travel
- 10 – 25m/min
- Long travel
- 15 – 40m/min
Typical applications
- Steel plants and rolling mills
- Sugar mill house and boiler bay
- Heavy fabrication and casting shops
- Power plants and cement works
Request for quotation
Specify a double girder for your duty
Ranges above are the envelope we build within. Send your actual capacity, span and lift height and we will engineer to it.